On my original #3367, the linkage allowing the secondaries to open is adjusted so that the secondaries are allowed to open at the same time and rate as the primaries. On my service replacement #3367, which was new in the box, the linkage is adjusted so the secondaries are locked out until the primaries about 1/2" or so. Which one is adjusted correctly?