61 engine installation
Collapse
X
-
Re: 61 engine installation
Hi Ron,
I would use two lengths of chain (each about 2 1/2 feet)and a engine leveler. One chain bolted to the two front exhaust mainfold bolts and one bolted to the rearmost exhaust manifold bolts. Hook the leveler to the front and rear chains. Make sure the chains are long enough to prevent any contact with the F.I. unit. I would not wrap the chains around the exhaust mainfolds, that would scratch up your new paint.
Make sure the bolts are tight.
Email offline should you need further assistance.
Best from Connecticut..........Mark- Top
-
Re: 61 engine installation
Hi Ron,
I would use two lengths of chain (each about 2 1/2 feet)and a engine leveler. One chain bolted to the two front exhaust mainfold bolts and one bolted to the rearmost exhaust manifold bolts. Hook the leveler to the front and rear chains. Make sure the chains are long enough to prevent any contact with the F.I. unit. I would not wrap the chains around the exhaust mainfolds, that would scratch up your new paint.
Make sure the bolts are tight.
Email offline should you need further assistance.
Best from Connecticut..........Mark- Top
Comment
Comment