    Does anyone have a good build checklist for a frame off restoration? What order are things usually done?

    I know it is a good idea to have the chassis completed including the motor chassis.
  • Roy B.
    Expired
    • February 1, 1975
    • 7044

    #2
    Re: Build checklist C1

    What your asking is vary hard to tell you, it all come down to time and money.

    Comment

    • Jim H.
      Expired
      • April 1, 2002
      • 112

      #3
      Re: Build checklist C1

      Originally posted by Roy Braatz (182)
      What your asking is vary hard to tell you, it all come down to time and money.
      I guess what I am trying to avoid is doing something then having to do it over again since I was not ready for the part. For instance, I painted the frame before I had the glass work completed. I should have waited until the glass work was completed before doing the frame.

      Same goes for the rest of the parts. Are there parts I should wait on fixing if I need them for mock up or fitting? For instance, it makes sense not put the dash on after I have the windshield in place. Those the are the type of build checklist I am looking for.

      Do I complete the doors before completing the windshield. When do i start wiring?

      Comment

      • Roy B.
        Expired
        • February 1, 1975
        • 7044

        #4
        Re: Build checklist C1

        OK what I do first is all the body work and fitting doors, trunk and hood. Then remove the body , clean it all and have each piece painted separate like the body, hood trunk and doors . While thing are being painted I then pull the engine, trans and parts to be rebuilt or repaired. And while that's is being done I attack the frame .
        THEN after all that I install the engine and what ever,install window hardware, body wiring ,weatherstripping, and put them back on the body //just complete the body (complete) and then put the complete body back on to the frame and connect everything.
        Like I said if you have the money while other things are being done mostly the body paint and mechanical you get the frame ready

        Comment

        • Gary C.
          Administrator
          • October 1, 1982
          • 17549

          #5
          Re: Build checklist C1

          Jim, not sure how detailed your looking for but here's 10k ft overview. Gary....
          - Body off frame, repair fiberglass, fit grille oval, check fit; doors, hood, trunk, decklid, etc.
          - Paint body off frame
          - Install grille oval with teeth onto body
          - Frame and suspension rebuild
          - Engine, transmission with shifter and rearend rebuilt and installed
          - Install radiator support, lower radiator shield onto frame
          - Install horns on radiator support
          - Insert steering column into firewall column opening and tie up steering box as close to firewall as possible
          - Lower Body onto frame
          - Reinstall steering box to frame
          - Rebuild door hinges, install door handles, check window regulators to see if need building, install windows, add weatherstripping
          - Install defroster vents, then windshield, then hang doors
          rest of the sequence is variable
          NCRS Texas Chapter
          https://www.ncrstexas.org/

          https://www.facebook.com/profile.php?id=61565408483631

          Comment

          • Roy B.
            Expired
            • February 1, 1975
            • 7044

            #6
            Re: Build checklist C1

            If you have a shop restore it 10K a foot get a second on your house.
            If you can do a lot your self and with the help of friends and stay away from Corvette specialist you can save 50%

            Comment

            Working...

            Debug Information

            Searching...Please wait.
            An unexpected error was returned: 'Your submission could not be processed because you have logged in since the previous page was loaded.

            Please push the back button and reload the previous window.'
            An unexpected error was returned: 'Your submission could not be processed because the token has expired.

            Please push the back button and reload the previous window.'
            An internal error has occurred and the module cannot be displayed.
            There are no results that meet this criteria.
            Search Result for "|||"